Business Summary
Print Friendly, PDF & Email

Business for Sale
Solar power plant 5MW greenfield project

Mandate ID: HR-1-BCI-4-1906-1
Transaction Type:
Business for Sale

Industry: Renewable Energy


Sector: Solar Energy


Country of Origin: Croatia |


Target Areas: European Union, BRICS countries (emerging markets Brazil, Russia, India, China, South Africa)


Business Review

Solar Power Plant project 5 MW in Croatia (mid Dalmatia/close to Adriatic coast) looking for strategic partner/buyer. Project is in RTB status with complete financial, legal and technical documentation and permits acquired:
- Location permits - Land rental (concession on 25 years)
- Connection agreements with Distribution System Operator (DSO)
- Building permits - Energy approvals from Ministry of Eeconomy (ME) - Eligible status from Croatian Energy Regulatory Agency (CERA)
The Project will be built on an extensive plot of over 150.000 square meters (located in mid Dalmatia/Croatia – one of of Europe’s sunniest region). It will have over 22.000 solarmodules located on a full hot-dip galvanised structure. The project will be cocnstructed with the most modern electrical equipment made by market leaders.The project consists of five individual solar power plants of 1 MW each, every solar plant has its own connection point to the grid, fence and meters. Also each solar plant has is on its own individual plot of land. The project will surrounded by a proper security fence and security cameras. The project will supply on annual basis more then 6.870.000 kWh to the grid and will be able to supply enough energy to nearly 8000 homes in the area.

Products
Electrical energy
Services
Production of electric energy from renewable energy sources
Financial Information

Asking Price: EUR 5,500,000


Highlights

Business model – Turnkey model with SPV acquisition

Total Price EUR: 5.500.000,00. The option can be executed in period of 6 to 12 months from the date of contract signing. With this model, owner guarantees to investor that project will be fully built and connected to the DSO grid. EPC part of this deal can be negotiated with investor in case investor has some preferred vendors or suppliers of equipment.
Turnkey model provides to the investor full coverage of development and construction costs, including connection costs and all applicable fees.
Note: Land rental and concessions (signed until 2039) are excluded from this amount.

Request More Information

The Glocal Connection
We are almost everywhere
CBA World Map
envelope-o linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram